The Reduction in the Loss of Rubber Latex Process by Flow Process Chart
Abstract
The study of purchased rubber latex process of Ban Saikao rubber co-operatives fund, Tambon Thung Wang, Amphoe Mueang, Songkhla, to reducing losses of process. Flow process chart was used to develop and resolved problems. It was found the time reduction from rubber latex to rubber sheet process is 120 minutes equal to 24.44 percentage. The time of hendle rubber sheet to drying house process is 482 minutes equal to 11.15 percentage. The process step was reduced 1 step equal to 25 percentage. Separation and packaging process, reducing the distance from drying house to the warehouse is 40 meters equal to 29.41 percentage. The time was reduced 1 minute equal to 5.56 percentage and the process step is reduced 1 step equal to 7.14 percentage. In conclusion, distance, time and process step were decreased, 9, 12 and 5.26 percentage, respectively.
Keywords
reduction in the loss, rubber latex process, flow process chart
Full Text:
PDF 13-23References
Chansiri Singhtaun. Process Analysis. [PowerPoint. Retrieved http://stin.ac. th/th/file.pdf
Mustasah Usoh. (2015). To Reduce Waste in the Process of Product Assembly by Balancing the Production Line . SAU JOURNAL OF SCIENCE & TECHNOLOGY, Vol. 1 (No. 1), 50-57.
Thanida Sunarak. (2018). Defect Reduction in the Welding Process of Motorcycle STAY R-L Part. The Journal of Industrial Technology Suan Sunandha Rajabhat University, Vol. 6 (No.1), 6-15.
The Rubber Ribbed Smoked Sheets. (2015). Bangkok: Rubber Authority of Thailand.
Refbacks
- There are currently no refbacks.
Copyright (c) 2019 The Journal of Industrial Technology Suan Sunandha Rajabhat University
Faculty of Industrial Technology Suan Sunandha Rajabhat University 1 U-tongnok Dusit Bangkok 10300 Tel. 66 2160 1438#22 E-mail. fit@ssru.ac.th